background image

*740158*

740158

General

The Benchmark is an automatic electromechanical swinging door operator for use on hinged, center pivoted and offset pivoted doors. 

When activated, the Benchmark drives the door to full open position, then electrical power is turned off and the door is closed by spring 

force. The activating circuit opens the door from any position in the closing swing. During a power failure, the Benchmark acts as a 

manual door closer (Size 3). Door opening and closing cycles, including opening speed, back check speed, hold open time delay, closing 

speed, and latch position, are adjustable.

Warning

always disconnect main power to the operator prior to 

servicing or cleaning.

  

Caution

this operator is for indoor use only.

Do not mount any accessories directly to the operator.

Replacement Parts & System Components

Part

27” Header

Full Length Header 

Single

Full Length Header Double

Premium Control 

Box

9130-3462SC 

9140-3462SC

9130-3462SC 

9140-3462SC

9150-3462SC

Gear Box

9130-3454S 

9140-3554S

9130-3454 

9140-3454

9150-3454S

End Caps

9130-334

9140-334

9150-334

Part

Pull

Standard Push

Extended 

reveal Push

Finish

Arm Assembly

9130-3077T

9140-3077 

9150-3077

9140-3077L 

9150-3077L

US28 

DC13

Table of Contents

General .....................................................................................................................................................................................................1
Replacement Parts & System Components .............................................................................................................................................1
Replacement Parts & System Components (Cont.) .................................................................................................................................2
1 Pre-Installation Site & Product Check....................................................................................................................................................3
2 Operator Installation ..............................................................................................................................................................................4
3 Wiring.....................................................................................................................................................................................................7
4 Arm & Cover Installation ........................................................................................................................................................................7
5 Operational Check .................................................................................................................................................................................9
6 Operator Adjustment ............................................................................................................................................................................10
7 Release for Service ............................................................................................................................................................................. 11
8 Benchmark III Software ....................................................................................................................................................................... 11

Swing Operator

Models 9130, 9140 & 9150

Benchmark III

Installation Instructions

Summary of Contents for Benchmark III 9130

Page 1: ...operator is for indoor use only Do not mount any accessories directly to the operator Replacement Parts System Components Part 27 Header Full Length Header Single Full Length Header Double Premium Control Box 9130 3462SC 9140 3462SC 9130 3462SC 9140 3462SC 9150 3462SC Gear Box 9130 3454S 9140 3554S 9130 3454 9140 3454 9150 3454S End Caps 9130 334 9140 334 9150 334 Part Pull Standard Push Extended ...

Page 2: ...2 Replacement Parts System Components Cont Double Push System Screw pack not shown ...

Page 3: ...Push Operator b 30 minimum for 27 Pull Operator c 36 minimum for Full Length Push or Full Length Pull Operators 1f Check that Door Weight is 200 lbs or less For heavier door consult factory 1g Check that a 115 volt single phase 60 Hz fused 15 amp 3 wire power supply is available at the side jamb with approximately 12 of wire available to connect to the Operator UL approved flexible conduit is reco...

Page 4: ...tem Page 6 b Full Length Pull System Page 6 c 27 Push System Page 7 d Full Length Push System Page 7 e Double Push System Page 8 f Low Ceiling Application Page 8 Note For Push Units with a Reveal greater than 6 refer to the installation sheet included in the Extended Arm package 2c Install Operator Mounting Bracket on Header Frame For Full Length systems also install Switch Bracket on Header Frame...

Page 5: ...tion Center Operator Cover with End Caps removed over opening and mark a vertical line at each end Align ends of Operator Mounting Bracket and Switch Bracket with vertical lines and adjust vertical position per diagram below Mark and prepare mounting holes 27 Push System Header Frame and Door Preparation ...

Page 6: ...acket with vertical lines and adjust vertical position per diagram below Mark and prepare mounting holes Double Push System Header Frame and Door Preparation Center operator cover with End Caps removed over opening and mark a vertical line at each end Align ends of Operator Mounting Bracket and Switch Bracket with vertical lines and adjust vertical position per diagram below Mark and prepare mount...

Page 7: ...Effect Cable around the Motor Power Cable Motor Power Cable Do not wrap the Motor Power Cable around the Hall Effect Cable Control Box Power Cable 3b Connect Activate Safety Key Switch and lock accessories as needed Refer to the accessory instructions for any accessories used Do not connect any remote activating device to the door unless it is located within line of sight of the door 3c When wirin...

Page 8: ... arm to the door 1 For push systems attach the push arm shoe to the door 2 For pull systems slide the pull arm roller into the track then insert a track cap on each end of the track and attach the track to the door Pull Arm 4f Adjust arm 1 For pull systems remove the locking screw from the arm 2 For push system remove the locking screw from the arm Pull Arm Push Arm ...

Page 9: ...L during the sizing cycle Check the door for binding If an electromechanical lock is being used check that the lock disengages before the operator opens the door Check fuses circuit breakers and connections Adjust the operator and check the door operation see Chapter 6 Operator Adjustment on page 15 Below are default settings Opening Speed 9 00 Back Check Speed 3 00 Hold Open Time Delay 10 00 Latc...

Page 10: ...ls the speed of the door near the full open position to prevent door slamming Slower Faster Hold Open Time Delay Hold Open Time Delay Controls the length of time the door remains in the full open position 1 sec to 15 sec Less Time Down to 1 sec More Time Up to 15 sec Back Check Position Back Check Position Door position where back check speed engages Less Latch More Latch Closing Speed Closing Spe...

Page 11: ...ion The first motion of the door will be towards the Door Open position The speed during Sizing is automatic and cannot be set from a potentiometer The door drives to full open and the system sets the open counter to full open The door closes at Closing Speed The system sets the closed counter to Full Closed when the latch goes up at the Closed position The system calculates all other parameters r...

Page 12: ...s Red Black Green Activation Device N O Dry Contacts Multiple activation devices should be connected in parallel Control box grounding stud For clarity not all components are shown on the control box PC board J8 10 position Control Box Power Cable J1 6 position Main Power Cable J5 2 position Motor Power Cable J3 4 position Hall Effect Cable Plug cables into these receptacles Connect Fail Safe to N...

Page 13: ... 14 Notes 1 printed two sides 2 printed black 3 tolerance 13 4 12 page saddle stitched booklet 5 drawings not to scale Title Benchmark III Swing Operator Installation Instructions Creation Date 12 15 10 Number 740158 Revision e Created By N A Activity 3899 Hancock Expwy Security CO 80911 Allegion 2014 Software InDesign CS6 4 25 11 000 Front 8 500 11 000 BEGINNING SHEET folded SHEET Front ...

Reviews: