
Installation and Setup
BLUEPOD TECHNICAL SERVICE
Tel: 1800 800 255 Email: [email protected]
Copyright Bluepod Coffee Co Pty Ltd
Page 7 of 12
LB3200 Colibri
DATE OF ISSUE: 27/01/2011
11. If your machine has a metal base cabinet, ensure the clear plastic drip tray hose (A)
and
waste container float/chain (B) are placed within the white waste water contain-
er (C)
12. Close the machine door. Switch on the mains electricity supply. The front LCD will
power up and the machine will run a short diagnostic program. Water may flow from
the dispensing nozzles; this will run into the drip tray/waste container.
13. “Temperature” should appear on the LCD display for some minutes after which it will
show “Ready for use”. Make 1 hot chocolate and 1 cappuccino and discard. These
will prime the powder conveyers.
14. Your machine is now setup and ready. Enjoy a drink! You may select short black,
long black, cappuccino, latte, mokaccino, hot chocolate or hot water.