background image

LAVA Computer MFG. Inc.                                                                                        STS-RBM Installation Manual 

– A03 

 
 

  2 Vulcan St. Toronto, ON        Tel:  +1 416 674-5942         www.lavalink.com

                                

6 of 8 

  Canada, M9W 1L2                   Fax: +1 416 674-8262         Toll-Free (US & Canada): 800 241-5282

 

 

  

Power Up Behavior 

With power applied the green Charge-Only LED will flash on and off for the first 2 to 3 seconds and then 
the yellow SimulCharge LED goes active. 
 

Note: 

If the Type 1 jumper is open, the green Charge-Only LED flashes with a pulse-pulse-
pause pattern for the first 2 to 3 seconds. 
 

Note: 

If the Type 1 jumper is closed, the green Charge-Only LED flashes with a continuous 
on-off pattern for the first 2 to 3 seconds. 

 

The Android Notification line at the top of the screen has an “LTM” displayed while the LTM Service is 
active. When the Notification information is examined; the message “LTM Handler, LAVA Tablet 
Manager is operational” is present. If the LTM notification is not present, the LTM Service is not running. 
 
Attach the STS-RBM to an Ethernet network via the RJ45 connector. The STS-RBM Network Link and 
USB Activity LEDs start to pulse to confirm an active network connection. In the event the network 
connection fails to work, verify the Ethernet interface is enabled in the tablet setup. 
 
The LAVA Battery Information application can be used to observe the battery charge status. This 
application can also be used to log the battery charging status to a file. 
 
The LTM.ini can be replaced at any point to alter the configuration. Changing the “user-debug=0” and 
“Ethernet-debug=0” settings can enable several useful debug messages. 

The “STS-RBM Reference Manual” 

contains a detailed description of the INI file. 

 
If the STS-RBM is placed into the Charge-Only mode using the Charge Mode button, the LTM Service 
shuts down and all USB devices are disconnected. 

Additional Comments 

With LTM running, the battery level is maintained between the upper and lower thresholds defined in the 
LTM.INI file. The LAVA Battery Information (LBI) application can be used to monitor the battery charge 
status. When the charging state is active, the battery charging current can be viewed with LBI to ensure the 
tablet is charging. The LBI application is used to log the battery charging status to a file, which allows the 
behavior over several hours to be monitored. 
 
The tablet charging icon cannot be relied upon to indicate if the battery is charging - only by checking the 
battery charge current, or observing the charge level for a period of time, is a valid check. The tablet draws 
less current from the external power supply during SimulCharge mode by design. If the tablet is not 
charging and a 5V USB supply is being used, verify the voltage reaching the STS-RBM is at least 5 volts. 
In some cases reducing the tablet screen brightness, by 10 to 20 percent, allows the battery to charge. 
 
The LTM.ini can be replaced at any point to alter the configuration. Changing the “user-debug=0” and 
“Ethernet-debug=0” settings can enable several useful debug messages. The “STS-RBM Reference 
Manual” contains a detailed description of the INI file. 
 
Removing STS-RBM power shuts down the LTM application, and all USB accessories are disconnected. 
 

Note: 

When using “board-type=2” or “board-type=3”, removing power from an STS-RBM does 
not result in a shutdown of the STS-RBM board if Battery Modulation is in the discharge 
state. The STS-RBM continues to function in this state until the lower charging threshold is 
reached as defined by “btty-lower-threshold”. 

Summary of Contents for STS-RBM

Page 1: ...t and improved network operation This document describes the STS RBM setup and software installation procedure for the tablet Contents Introduction 2 LAVA STS RBM Software Release Package 3 Product Setup 4 Installation of LAVA Software 4 Preparation of the STS RBM Board 5 Connecting STS RBM to the Tablet 5 Powering up the STS RBM PoE 5 Powering up the STS RBM 5V USB Supply 5 Power Up Behavior 6 Ad...

Page 2: ...application as a Device Administrator and activate the KNOX license Disable the WiFi connection optional Turn off the auto screen brightness on the Tablet Verify the time zone and time on the Tablet Verify the TYPE jumpers on the STS RBM are set for your tablet model Connect the STS RBM Product to the Tablet with the supplied LAVA cable Apply power to the STS RBM Product Do not plug in USB accesso...

Page 3: ...fy the battery charge status Installation of this application is recommended for initial verification of the STS RBM This application can be removed once the STS RBM is operational This application is also available on Google Play as the LAVA Advanced Battery Information 5 LAVA Battery Information Manual PDF The manual for the LAVA Battery Information application The source code for the LSR APK ca...

Page 4: ...ce Administrator Locate the Device administrators menu On newer Tablets the required menu is under the Lock screen and security Other security settings On older Tablets the required menu is under General Security Enable LAVA Tablet Manager VII in the Device Administrator menu and then select ACTIVATE After selecting activate the next menu presented is for accepting a Samsung KNOX license If you pr...

Page 5: ...erify the connector orientation to prevent damaging the receptacle Plug the other end of the LAVA cable to the tablet Always verify the connector orientation to prevent damaging the receptacle Powering up the STS RBM PoE Attach an RJ45 Cat 5 cable between the STS RBM and a PoE Enabled Network Switch The alternative is to use a PoE Power Injector and a non PoE Network Switch Warning When using a Ne...

Page 6: ...file If the STS RBM is placed into the Charge Only mode using the Charge Mode button the LTM Service shuts down and all USB devices are disconnected Additional Comments With LTM running the battery level is maintained between the upper and lower thresholds defined in the LTM INI file The LAVA Battery Information LBI application can be used to monitor the battery charge status When the charging sta...

Page 7: ...m 7 of 8 Canada M9W 1L2 Fax 1 416 674 8262 Toll Free US Canada 800 241 5282 STS RBM Board Board Layout This document presents the basic information for the STS RBM board layout Please consult the STS RBM Reference Manual for a detailed description of the board connectors buttons and options STS RBM L181 1 Board ...

Page 8: ...00 241 5282 Internet www lavalink com helpdesk History Document Revision Date Change A00 Oct 02 2016 Initial release A01 Nov 01 2016 Revised the software installation steps Revised the Power Up Behavior section A02 May 16 2017 Revised the document to follow layout of the eSTS Installation Manual A03 Sep 27 2017 Added effect of a Mobile Device Management application during LTM installation Removed ...

Reviews: