+1.800.867.4580 [email protected] www.laundryjet.com
18
Slide Port Installation
5.3
Step 2 - Slide Sheetrock Template
Sheetrock Template
▪
Install sheetrock over the Port 90 and Port Mount Brackets
▪
Trim around outside edge of the Port 90 and remove material
▪
Cut the Port 90 so that it is flush with the sheetrock.
▪
Remove the section for Slide ports from the Sheetrock Template
▪
Position the round portion on the back of the template into the Port 90
▪
Using a level use the top horizontal edge to level the template
▪
Trace around the inside of the 1" diameter hole in the template
▪
Using a 1" hole saw, cut a hole through the sheetrock