Preparations
6
Operation with cooling coil
(
➾
Section 10.
Accessories)
−
Pull the clamping bracket to the back for fixing the
cooling coil while releasing it with a screwdriver.
−
Push the cooling coil on the clamping bracket.
−
Install the clamping bracket again.
Operation with fixing rod
(
➾
Section 10. Accessories)
−
Pull the clamping bracket to the back while releasing it
with a screwdriver.
−
Install the fixing rod together with the clamping bracket.
Operation with external consumer
(
➾
Section 5.4.)
−
The immersion thermostats have to be fixed carefully at the bath, for they must
not fall into the bath.
−
In that case don’t touch the bath liquid! Pull out mains plug immediately!
a) Bath/Circulation thermostats
−
Place the unit on a flat surface.
☞
−
Do not cover the ventilation openings at the
back.
−
Keep a clear distance of at least 20 cm.
−
Put the control unit with the bath bridge on
the bath.
−
−
−
−
When operating without an external
consumer (bath thermostat) the setting
knob has to be turned so that the flow
comes out of the outlet for bath circulation
(
➾
ill. 3, Section 5.1.).
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com