
7: Network, Serial Line, Tunnel, and Modbus Settings
IntelliBox-I/O 2100 User Guide
62
Tunnel – Start/Stop Characters Page
If you click
Start/Stop Chars
at the top of one of the Tunnel pages, the Tunnel –
Start/Stop Chars page displays. This page shows the start and stop characters used for
the tunnel selected at the top of the page and lets you change the settings for that tunnel.
Figure 7-7 Tunnel – Start/Stop Chars Page
Summary of Contents for I/O 2100
Page 1: ...Part Number 900 474 Revision B March 2012 IntelliBox I O 2100 User Guide ...
Page 36: ...5 Getting Started IntelliBox I O 2100 User Guide 36 Figure 5 1 Lantronix DeviceInstaller ...
Page 86: ...9 Services Settings IntelliBox I O 2100 User Guide 86 Figure 9 7 HTTP Configuration Page ...
Page 95: ...10 Security Settings IntelliBox I O 2100 User Guide 95 Figure 10 1 SSH Server Host Keys Page ...
Page 123: ...12 Advanced Settings IntelliBox I O 2100 User Guide 123 Figure 12 3 Email Configuration Page ...