15
Empty ports must be sealed with the protective caps supplied.
Page 1: ...IPES IES 0008B Series 8 10 100TX w 8 PoE at af Industrial Un Managed Switch User Manual Mar 2022...
Page 2: ...y an STP network cable in demanding electrical environments Examples of demanding indoor environments are where the network cable is located in parallel with electrical mains supply cables or where la...
Page 3: ...consent of Lantech Communications Global Inc Products offered may contain software which is proprietary to Lantech Communications Global Inc The offer or supply of these products and services does no...
Page 4: ...occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encourage...
Page 5: ...ntent Chapter 1 Introduction 5 Model Lists 5 Chapter 2 Hardware Description 5 2 1 Physical Dimension 5 2 2 Package Content 6 2 3 IP Protection 7 2 4 LED Indicators 10 Chapter 3 Hardware Installation 1...
Page 6: ...ports PoE ports Power input IPES 0008B 41 12V 8 8 Dual 9 56VDC IPES 0008B 41 12V 5A 8 8 Dual 9 36VDC IPES 0008B 41 72V 8 8 Dual 50 4 90VDC IES 0008B 41 12V 8 NA Dual 9 5 60VDC IES 0008B 41 72V 8 NA Du...
Page 7: ...6 2 2 Package Content Manual CD Product By request...
Page 8: ...t access to hazardous parts e g electrical conductors moving parts and the ingress of solid foreign objects Level Object size protected against Effective against 0 No protection against contact and in...
Page 9: ...o 15 from its normal position Test duration 10 minutes Water equivalent to 3 mm rainfall per minute 3 Spraying water Water falling as a spray at any angle up to 60 from the vertical shall have no harm...
Page 10: ...0 minutes Immersion at depth of at least 1 m measured at bottom of device and at least 15 cm measured at top of device 8 Immersion beyond 1 m The equipment is suitable for continuous immersion in wate...
Page 11: ...tus and their meanings for the switch LED Color Status Meaning PWR1 Green On Power 1 is active Off Power 1 is inactive PWR2 Green On Power 2 is active Off Power 2 is inactive P1 P8 Link Ack On A netwo...
Page 12: ...ssory with packing content list 3 1 2 Mount the switch on desired position For the best ventilation it is suggested to mount the switch on metallic surface 3 1 3 Connect the M12 connector of power inp...
Page 13: ...he output voltage of power supply must exceed 48VDC for 802 3af and 53VDC for 802 3at operation with IPES 0008B 72V only 72VDC can power both the 802 3af and 802 3at PD The power consumption can satis...
Page 14: ...to protect the switch to get exposed with dirt Plug the connector to the power supply plug then turn on the power supply Ground The chassis is grounded via a separate ground nut M3 Use toothed locking...
Page 15: ...he status of LED make sure the switch was in working status Note The protection class IP41 54 is only achieved when bolted together The other components attaching to the system have to meet with the I...
Page 16: ...15 Empty ports must be sealed with the protective caps supplied...