Installation Guide
Connect 2.0
Shelter, wiring guide for 8ft solar powered unit
www.landscapeforms.com Ph: 800.521.2546
Date: February 14, 2019
Page 1 of 6
1.
Anchor
kit
installation
2.
Frame
assembly
3.
Roof
assembly
4.
Wall
glass
assembly
5.
Wiring
connections
Order
of
operations:
Tools
Required
•
wiring
tools
•
3/32”
hex
key
•
3/16”
hex
key
•
5/16”
Socket
wrench
•
Flat
head
screwdriver
or
¼”
socket
wrench
Included
components:
•
Uplights,
with
wiring
harnesses,
pre
‐
installed
in
front
horizontal
beam
•
Down
lights,
with
wiring
harness
and
connectors,
one
per
rafter
•
Wayfinding
lights,
with
wiring
harness,
two
per
unit
•
Glass
solar
panel
with
brackets
and
attaching
hardware
(instructions
separate
for
roof
panel)
•
16
batteries
with
wiring
harnesses
BATTERY
INSTALL
LOCATION,
REAR
HORIZONTAL
Fig.
1
– lighting
component
locations
8ft
shelter
UPLIGHTS,
PRE
‐
INSTALLED
DOWNLIGHT,
LOCATION
FOR
CENTER
SUB
‐
HARNESS
DRIVER
PLATE,
BATTERY
INSTALL
LOCATION
RIGHT
REAR
POST
WAYFINDING
LIGHTS
DOWNLIGHT
FRONT
OF
SHELTER
RIGHT
FRONT
POST
ASSEMBLE
WITH
CARE!
Pangard II
Polyester
Powdercoat is
a
strong,
long
‐
lasting
finish.
To
protect
this
finish
during
assembly,
place
unwrapped
powdercoated parts
on
packaging
foam
or
other
non
‐
marring
surface.
Do
not
place
or
slide
powdercoated parts
on
concrete
or
other
hard
or
textured
surface
– this
will
damage
the
finish
causing
rust
to
occur.
Use
touch
‐
up
paint
on
any
gouges
in
the
finish
caused
by
assembly
tools.