2-4
1P480rev0718
ASSEMBLY INSTRUCTIONS
4.
If equipping unit with scrapers or tire track removers,
install at this time.
5.
After the drawbar is attached route the hoses along
drawbar toward the tractor. Use the hose clamps
provided to anchor the hoses to the drawbar.
Figure 2-4: Drawbar Hydraulic Hoses
6.
Install hub and spindles into the wheel arms and
secure in outside hole farthest from the hub. Secure
with 1/2-13 x 3” Screws and Locknuts. Apply
anti-seize to spindles.
7.
Install wheels and tires to hubs using (10) 1/2-20 x 1
Wheel Bolts. Torque wheel bolts to 80-85 ft/lbs.
Charge the Hydraulic System.
For a more detailed view, refer to the Hydraulic
Schematic Diagram.
Top Plate
Clamp Pair
HHCS, 1/4-20 x 1/2
Hydraulic
Hoses
Summary of Contents for SSB-8
Page 2: ......
Page 6: ......
Page 12: ...1 6 1P480rev0718 SAFETY INFORMATION Figure 1 4 Safety Decals Locations 3K706 9J302 ...
Page 13: ...SAFETY INFORMATION 1 7 Figure 1 5 Safety Decals Locations 8 Foot Models 3 ...
Page 20: ...1 14 1P480rev0718 SAFETY INFORMATION Figure 1 12 Safety Decals Locations SD 12 Models 3 ...
Page 22: ...1 16 1P480rev0718 SAFETY INFORMATION Table provided for general use NOTES ...
Page 29: ...ASSEMBLY INSTRUCTIONS 2 7 Table provided for general use NOTES ...
Page 56: ...2 34 1P480rev0718 ASSEMBLY INSTRUCTIONS Table provided for general use NOTES ...
Page 74: ...3 18 1P480rev0718 OPERATION Table 3 7 Rear Agitator Seed Chart ...