![Landis+Gyr Gridstream IV Series User And Installation Manual Download Page 86](http://html1.mh-extra.com/html/landis-gyr/gridstream-iv-series/gridstream-iv-series_user-and-installation-manual_673736086.webp)
C
Series IV Concentrator U and I Guide
98-1031 Rev AA
83
Bench Testing
The Concentrator Test Bench verifies the following critical functionality before deployment to the
field.
•
WAN connectivity (DCW and Gridstream radio configuration).
•
CPU configuration.
•
LAN transceiver status.
Figure C.1 Cross Dock Test Setup
The test setup consists of about 10 to 15 concentrators configured to work with the Gridstream test
network (Network ID 670).