background image

 

18 

5.4  Water connection 

Connection of the stove  to the hydraulic system must be exclusively performed by qualified 

personnel, who is able to perfectly perform the installation, complying with the regulations in force 

in the Country of installation.  

If the installation of the stove requires interaction with another pre-existing system equipped with another 

heating device (gas boiler, methane boiler, gasoline boiler, etc.), contacting qualified personnel able to 

respond to the conformity of the system, according to the requirements of the law in force regarding the 

subject, is more recommended.

  

 

The company denies any liability in case of damages to property or persons or in case of no or 

incorrect operation if the aforementioned warnings are not complied with.  

 

Caution: 

To connect the delivery pipe, return pipe, refilling pipe and drains arrange flexible hoses at least 70 

cm long and shut-off shutters in order to isolate the machine from the water system should moving it to perform 

routine/special maintenance be required

.

  

Connect the thermal safety drain of the machine to an appropriate drain funnel with no shut-off valves.  

 

In case of thermal safety drain valve operation, the water must be free to flow without causing damage to 

persons and built-up area. 

 

When the instrument is fully operational it produces hot water at a temperature necessarily lower than the 

boiling one and therefore the thermal system must be designed in compatibility with the machine 

specifications. 

During installation and operation take into account that disposal of the minimum power delivered by the 

machine must be ensured.

  

Make sure that the thermal hydraulic system is fitted with an additional and adequate closed 

appropriately dimensioned expansion vessel. 

 

For the installation of an additional expansion vessel take into account that usually 1 litre of vase compensated 

10 litres of system and at least 1 litre is always dedicated to the water inside the boiler. The expansion vessel 

inserted inside the device is pre-charge at the pressure indicated in the plate, adjust the pre-charged pressure 

of the expansion vessels to the operating pressure of the thermal system. 

 

We recommend installing a 1” anti-condensation valve with 55 °C opening and softener systems.  

 

It is best to keep in mind that deposit drastically lower performance due to their extremely low thermal 

conductivity. 

5.4.1  System filling 

Before performing the boiler connections thoroughly wash the thermal system

 (pipes, heating bodies, 

etc.) with appropriate paint or deposit removers able to remove any residues which may compromise the 

correct operation of the boiler. 

Hydraulic connections must be performed rationally using the connections of the boiler. The boiler safety 

valve drain must be connected to a drain funnel. Otherwise, if the drain valve operates flooding the room, the 

boiler manufacturer shall not be deemed responsible. 

We recommend filling the system at a pressure of 1.0 - 1.2 bar (pressure is shown with the b symbol on the 

boiler display) the boiler can still function from 0.6 bar to 2.5 bar. 

In case of installation in spaces where temperature may drop below 0°C, inserting appropriate antifreeze in 

the system is required since the boiler does not have an automatic antifreeze system

 

 

Thermostoves with domestic hot water production 

If the water hardness of your home is high, 

we recommend installing a softening system and a filter 

upstream. 

We recommend having the exchanger undergo yearly maintenance to remove limestone sediments and 

mineral salts.  

 

 

Summary of Contents for IDRO HYDRO

Page 1: ...nance The instruction manual is an integral part of the product Laminox S r l reserves the right to change the characteristics and data reported in the following document at any time and without warni...

Page 2: ...le Connect the stove to the mains only after proper professional connection to the chimney flue The power cable plug must remain accessible after installation of the stove Only operate the stove with...

Page 3: ...4 5 2 Tubes and maximum usable lengths 14 4 5 3 Holes for exhaust tube passage on walls or roof recommended insulation and diameter 15 4 5 4 Using a traditional type chimney flue 15 4 6 Using an exter...

Page 4: ...haust pressure sensor 33 8 1 2 Boiler Structure temperature sensor 33 8 1 3 Smoke temperature sensor 33 8 1 4 Water temperature sensor 34 8 1 5 Water pressure switch 34 8 2 Alarms 34 9 WARNINGS AND MA...

Page 5: ...reater than 45 Fig 2 Each device must have its own chimney flue with a section equal to or greater than the diameter of the fume exhaust pipe of the stove and a height no less than the one stated Neve...

Page 6: ...tructed so as to prevent penetration into the flue of rain snow or foreign bodies and so that in the event of winds in any direction and at any angle it assures the discharge of combustion products wi...

Page 7: ...tion device The room adjacent to the permanent openings must meet the requirements set out in the paragraphs above The adjacent room cannot be used as a garage for storage of combustible material or f...

Page 8: ...see attached sheet 2 4 Product identification data see attached sheet The technical label shows device data and performance Tampering with removing or lack of a technical label makes installation and...

Page 9: ...rizontal splits Since pellet characteristics and quality greatly influence the autonomy efficiency and proper operation of the stove we recommend AVOID using pellets with dimensions different from tha...

Page 10: ...e installed in a technical room It is forbidden to install them in open verandas or outdoors Installation in rooms containing other generators that collect air from the environment is prohibited par 6...

Page 11: ...ch must always be guaranteed 4 2 1 Corner installation mm 4 2 2 Wall installation mm Safety distances from flammable material Minimum distance in air from the flammable rear wall P 200 Minimum distanc...

Page 12: ...12 4 2 3 Distance from flammable ceilings and false ceilings mm 4 2 4 Distance of fume exhaust system from flammable walls mm...

Page 13: ...for positioning air intake vents Pellet stove combustion air intake vents cannot be connected to an air distribution system or directly to a wall mounted air intake vent Correct and safe positioning o...

Page 14: ...equipment boilers hoods etc is prohibited 4 5 2 Tubes and maximum usable lengths Painted aluminised steel tubes minimum thickness 1 5 mm stainless steel tubes Aisi 316 or porcelain tubes minimum thic...

Page 15: ...is flammable or has flammable parts 100 280 300 Concrete wall or roof 50 180 200 Brick wall or roof 30 140 160 4 5 4 Using a traditional type chimney flue If you wish to use an already existing chimne...

Page 16: ...secured to the building Fig 13 should be used An inspection area should be created at the base of the duct for performing periodic checks and maintenance It should be equipped with a windproof chimney...

Page 17: ...orklifts cranes etc 5 2 Unpacking Unpack the product being careful not to damage or scratch it Remove the accessory package and any pieces of polystyrene or cardboard used to block removable parts etc...

Page 18: ...d with an additional and adequate closed appropriately dimensioned expansion vessel For the installation of an additional expansion vessel take into account that usually 1 litre of vase compensated 10...

Page 19: ...3 Pressure switch 4 Vent safety 5 System delivery 6 Flue gas motor 7 Primary air inlet 8 Expansion vessel 9 System return 10 Circulation pump 11 Power supply outlet 12 Main switch 13 Serial port 14 E...

Page 20: ...thermostat connected to the circuit board see electrical diagram The thermostat connection is made using a 2x0 5 mm2 cable This operation should be performed by qualified personnel If you choose to us...

Page 21: ...and the fame is always present in the brazier If the flame is extinguished a dense white smoke may form able to cause an explosion in the combustion chamber The explosion can be of such intensity as t...

Page 22: ...unctions increase in set power value passage from a sub menu to the next one BUTTON 3 MENU SELECTION Functions Passage to sub menus passage from programmable thermostat and clock programming passage t...

Page 23: ...r Fill up the system through a refill valve to be provided externally to the stove During recovery it is advisable not to exceed a maximum pressure of 1 bar Pressure can be read directly on the pressu...

Page 24: ...sage Third phase Stabilisation Once combustion triggering has been detected the third phase will start and the display will show the message FIRE PRESENT Pellet feeding is reduced and ventilation incr...

Page 25: ...ure To modify this value use buttons 1 and 2 until you reach desired temperature 7 C to 40 C If the room temperature reaches the set temperature the stove goes into minimum power and the last line of...

Page 26: ...The hot air fan will also continue to run until the stove cools down CAUTION Never disconnect the power supply at this stage as this may create problems for the stove and compromise the subsequent pha...

Page 27: ...Menu 01 WATER PRESSURE This item is only available on hydro and boiler models firmware update Dec 2010 and allows you to bypass pressure control when the heating stove or boiler is connected to an ope...

Page 28: ...After having set the first parameter M 3 2 01 DAILY CHRONO to on you can set two start ups and two shutdowns For each parameter you can either set the value off if you do not wish to activate or the t...

Page 29: ...on or off based on which programming you wish to activate corresponding to that day of the week See following tables PROGRAMME 1 menu level selection meaning possible values 03 03 02 START PROG 1 on...

Page 30: ...weekend programme only after having disabled weekly programming PROGRAMME 3 menu level selection meaning possible values 03 03 20 START PROG 1 on time 00 00 23 50 OFF 03 03 21 STOP PROG 1 off time 00...

Page 31: ...do not return under the set values the stove shuts off and goes into stand by mode During shutdown the display shows the message WAIT COOLING This display message remains until re lighting conditions...

Page 32: ...h unit pellet load times are increased or decreased by 2 5 7 11 Menu 11 FIREPLACE TYPE This menu allows users to simultaneously increase or decrease all smoke fan parameters draft The set default valu...

Page 33: ...as combustion parameters not adjusted correctly in particular the low power combustion parameters If the combustion chamber door is left open If pellet accumulates inside the brazier supply duct resul...

Page 34: ...8 1 5 Water pressure switch The water pressure switch is directly connected to the electronic board and keeps operating water temperature in the boiler under constant control allowing safe use of the...

Page 35: ...p phase a maximum waiting time about 20 minutes is exceeded without the machine switching on successfully see ignition AL 6 No pellet This alarm indicates a flame failure in the brazier during normal...

Page 36: ...ait and make sure that the combustion of pellets left in the brazier has been completed If necessary call a support centre to replace the sensor AL A Water temp This alarm is activated by the over tem...

Page 37: ...not allowing correct boiler operation and which must be removed Every two days remove the brazier by simply lifting it from its housing then clean it from ash and any incrustations which may have for...

Page 38: ...t a Technical Support Centre to replace 9 10 Replacing the remote control battery Replace the old battery with a type CR2025 3V new one paying attention not to invert the polarity polarity is shown on...

Page 39: ...smoke exhaust duct new silicone where required Inspection and checking the gasket seals replacement and silicone application where required Tank emptying and cleaning Checking the electrical part and...

Page 40: ...Laminox S r l Hydro Division Zona Industriale Callarella 261 263 62028 SARNANO MC Italy Tel 39 0733 657 622 Fax 39 0733 657 494 www laminox com e mail idro laminox com rev 1 2021 EN...

Reviews: