6
3 ASSEMBLY
Here are some general recommendations to follow in order to prevent accidents or damage to the product:
•
Unpacking must be performed by at least two people.
•
All handling operations must be carried out using appropriate means and in full compliance with
safety regulations.
•
The positioning of the packed product must be maintained in accordance with the guidelines supplied by
pictograms and written on the packaging.
•
If using ropes, straps, chains, etc., make sure they are suitable for the weight to be unloaded and are in
good condition.
•
When moving the package, move with slow and continuous movements to avoid tearing the ropes,
chains, etc.
•
Do not tilt excessively in order to avoid overturning.
•
Do not stand within range of the loading/unloading means (forklifts, cranes, etc.).
3.1 Unpacking
Unpack the product, being careful not to damage or scratch it. Remove the accessory package and any
pieces of polystyrene or cardboard used to block removable parts from the furnace.
Also remember not to leave packaging components (plastic bags, polystyrene, etc.) within the reach of
children, as they could be potential sources of danger. Dispose of them according to regulations.
3.2 Electrical connection
The stove is supplied with a power cable that must be plugged into a 230V 50Hz outlet.
Outlet connection in the rear of the stove is illustrated in Figure
Absorbed power is indicated in the "SPECIFICATIONS AND TECHNICAL DATA" chapter of this manual.
By law, the system must be properly grounded and with a differential circuit-breaker.
Make sure that the electrical power cable does not come into contact with hot parts when set in its final
position.
3.3 Assembly
1 Insert the pipes into the holes below and push them fully until they are well fixed
(Fig.2)
2 Fit the net on the pipes and slide it to the bottom
(Fig. 3)
3 Place the lower dish
(Fig.4)
4 Lay the three support and the upper dish, then secure everything
(Fig.5)
5 Tighten the carrying handle
(Fig.6)
Power
outlet