Lamborghini Caloreclima GP 20 Installation And Maintenance Manual Download Page 4

GENERAL

- 2 

-

INTrODUCTION

The present manual is designed for those who will use the pellet burner. You will find inside the necessary mounting, star-

ting, maintenance and safety data for the device.

We recommend to keep our instructions about the safety measures with a special responsibility. 

Operations that require removal of elements should be executed only by qualified and authorized specialists.

The remedial actions and settings which are not described in the manual, should not be executed.

APPLICATION fIELD

The pellet burner is created for burning pellets from wooden fragments. 

It is installed in special boilers or adjusted ones, used to work with another type of fuel.

TECHNICAL DATA

DESCRIPTION

GP 20

Fuel

wooden pellets 6-12mm

Indulgence power

10-20 Kw

For boilers with burning area up to 3m

2

(heat-exchanging surface)

Fuel tank

not a part of the delivery

Fuel feeding

outside auger transporter, included into the burner set

Tracking the burning process

photo-, heating and positioning sensors

Light signalization for the burner performance
Controlling

microprocessor

Ignition

automatic

Possibility for adjusting the outgoing power in wide limits
Net connecting

220 – 240 V

Ignition electricity

up to 4,5 A

Consumed average power

below 100 W

Burner weight

16 kg

Auger transporter

9 kg

SAfETY

SAFETY RULES

Before starting the burner it is necessary to know in details all regulations of the hereby manual. 

It is needed to keep all common rules for the safety when working with heating-technical devices.

 

The boiler premises where the equipment will be installed, must respond to all the fire requirements according to the 

current standards and lows.

 

The device should be placed a in way, so there will be enough space for cleaning, removing the soot from the burner, 

the boiler and the draught pipes.

 

The burner must be installed in the boiler outlet with the relevant isolation.

  It must be joined up with nuts. Under one of the nuts there must be put a 

SPECIAL T-FIGURE TIN DETAIL

 which is for 

pushing the limit switch, 

INFORMING THAT THE BURNER IS INSTALLED

.

Summary of Contents for GP 20

Page 1: ...BRUCIATORE A PELLET PELLET BURNER BR LEUR PELLETS GP 20 LIBRETTO DI INSTALLAZIONE E MANUTENZIONE INSTALLATION AND MAINTENANCE MANUAL NOTICE D INSTALLATION ET D ENTRETIEN...

Page 2: ...ty installation use and maintenance of the burner Keep the manual in a safe place for future consultation Installation must be carried out by qualified personnel in conformance with technical standard...

Page 3: ...ATION 36 USe and MAIntenance MAINTENANCE Page 38 BURNER MAINTENANCE 40 POSSIBLE TROUBLESHOOTING 41 Complimenti on your excellent choice And thank you for choosing our products LAMBORGHINI CALORECLIMA...

Page 4: ...et Tracking the burning process photo heating and positioning sensors Light signalization for the burner performance Controlling microprocessor Ignition automatic Possibility for adjusting the outgoin...

Page 5: ...R switch placed on the burner s cover it stoppes the feeding of the logistical module in the burner and clears the alarm or by stopping the common feeding of the boiler through its main switch The pro...

Page 6: ...GENERAL 28 DESCRIPTION OF THE CONSTRUCTION 40 2 4 220 165 251 34 178 272 5 1 1 Burner 2 Auger transporter 3 Flexible tube...

Page 7: ...ter Flexible tube Body feeding chute and cover Fan Ignite heater Control block Sensors exclusion mechanism photosensor thermoswitch The burner contains mainly of the following composition parts Body w...

Page 8: ...PTION CODE 1 Auger s engine GP 20 A CODE 001 2 Auger spring GP 20 A CODE 002 3 Auger s tube GP 20 A CODE 005 4 Fan GP 20 CODE 008 5 Logical module GP 20 CODE 009 6 Feeding module GP 20 CODE 009BPS 7 I...

Page 9: ...ENGLISH GENERAL 31 POSITION OF THE ELEMENTS...

Page 10: ...GENERAL 32...

Page 11: ...ENGLISH GENERAL 33...

Page 12: ...scheme ATTENTION The connection must be done by a qualified electrical technician and there must be paid high attention to the safety grounding of the device The connecting is shown in the present man...

Page 13: ...iler ALARM Thermostat Brown Black Power 220 V Neutral conduct Blue Yellow green First feeding of the auger Start burner signal for logic module Photosensor Photocell flame detector Feeding and fitting...

Page 14: ...stat must be set at 80 90 C In this case the burner is fed with pressure the POWER light is on there is a signal from the boiler to the burner to start the RUN light is on and the burner starts for ex...

Page 15: ...nto the burner and clears the alarm or by turning off the common boiler feeding through its main circuitbreaker When the electrical supply stops and then restores the burner starts automatic TURNING T...

Page 16: ...tempts for new ignition end The number of the ignition attempts is n 1 where n is the setting of counter C1 If at n 1 attempts the ignition is not reached at the n attempt in this case the third attem...

Page 17: ...decrease the pellets feeding If the temperature is too low increase the quantity of the air supply if the pellets level in the burner is too low check the flue gases temperature see above and decreas...

Page 18: ...f pellets quality Before starting the burner cleaning it must be stopped by the above way turn the thermostat down and leave the burner working for 4 8 minutes more turn off the boiler s main switch a...

Page 19: ...rheating on the burner s feeding tube not pressed exclusion mechanism controlling the reliable burner s fixture to the boiler unsuccessful ignition if there is not enough initial dose of pellets or a...

Page 20: ...INI si riserva il diritto di apportare senza obbligo di preavviso tutte le modifiche che ritiene pi opportuno per l evoluzione del prodotto The illustrations and data given are indicative and are not...

Reviews: