8
MACHINE INSTALLATION AND INSPECTION
When installing and inspecting
Virtual Rabbids: The Big Ride
, be very careful of the following points
and pay attention to ensure that the players can enjoy the game safely.
•
Be sure to turn the power
OFF
before working on the machine.
•
Make sure the power cord is not exposed on the surface (floor, ground, etc.) where people walk.
•
Check that the rubber glide feet levellers are set correctly on the floor so that the game cabinet
is level and stable.
•
Always make complete connections for the integrated circuit (IC) logic PC Boards and other
connectors. Insufficient insertion can damage the electrical components.
•
Only qualified personnel should inspect or test the integrated circuit (IC) logic PC Boards.
•
If any integrated circuit (IC) logic PC Boards should need servicing, please contact the nearest LAI
Games Distributor (refer to the back page of this manual).
CAUTION:
Before
switching the machine on be sure to check that the sticker next to the
AC main input plug indicates the correct voltage for your area!
WARNING:
Always
turn
OFF
mains power before removing safety covers and refit all safety
covers when work is completed.
WARNING:
Do not
use extension cords or power boards to power the game
–
it needs to be
connected to a single wall outlet only.
WARNING:
Only use the power cord supplied with your machine.
Summary of Contents for VIRTUAL RABBIDS THE BIG RIDE
Page 27: ...27 9 Close bottom door and the top access door...
Page 67: ...67...
Page 68: ...68...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71...
Page 72: ...72...
Page 73: ...73...
Page 74: ...74...
Page 75: ...75...
Page 76: ...76...
Page 77: ...77...
Page 78: ...78...
Page 79: ...79...
Page 80: ...80...
Page 81: ...81...
Page 82: ...82 MECHANICAL ILLUSTRATIONS MAIN ASSEMBLY...
Page 83: ...83 MAIN ASSEMBLY COMPACT VERSION...
Page 84: ...84 MAIN ASSEMBLY MINI VERSION...
Page 85: ...85 MAIN TOWER ASSEMBLY...
Page 86: ...86 MAIN TOWER ASSEMBLY MINI VERSION...
Page 87: ...87 TOWER BASE ASSEMBLY...
Page 88: ...88 DB BOX 240V AND 110V VERSIONS...
Page 89: ...89 FRONT ROTULE ASSEMBLY...
Page 90: ...90 BACK PANEL ASSEMBLY STANDARD AND MINI VERSIONS...
Page 91: ...91 TOWER BASE STATION HATCH AND SLED BASE STATION HOUSING...
Page 92: ...92 BASE STATION ASSEMBLY MINI VERSION...
Page 93: ...93 LEFT AND RIGHT DUST CLOUD ASSEMBLY...
Page 94: ...94 LEFT 1 AND RIGHT 2 HEADER ASSEMBLY...
Page 95: ...95 MOTION BASE ASSEMBLY...
Page 96: ...96 PC CHASSIS ASSEMBLY...
Page 97: ...97 PCB BOARD ASSEMBLY...
Page 98: ...98 POWER SUPPLY ASSEMBLY...
Page 99: ...99 MONITOR ASSEMBLY...
Page 100: ...100 MONITOR ASSEMBLY COMPACT VERSION...
Page 101: ...101 MONITOR ASSEMBLY MINI VERSION...
Page 102: ...102 SEAT ASSEMBLY...
Page 103: ...103 LEFT SKI ASSEMBLY...
Page 104: ...104 RIGHT SKI ASSEMBLY...
Page 105: ...105 SLED ASSEMBLY...
Page 106: ...106 SLED COVER ASSEMBLY...
Page 107: ...107 SLED COIN DOOR ASSEMBLY...
Page 108: ...108 CASH BOX ASSEMBLY...
Page 109: ...109 TOWER BACK DOOR 1 ASSEMBLY...
Page 110: ...110 TOWER BACK DOOR 2 ASSEMBLY...
Page 111: ...111 TOWER UPPER LED...
Page 112: ...112 HTC VIVE HEADSET ASSEMBLY...