53
UPDATING A CABINET USING A BOOTABLE USB
Virtual Rabbids: The Big Ride has two PCs, each of which need to be updated individually
–
always
ensure that both PCs are running the same version of software by updating them at the same time.
1.
Ensure the HDMI switch is set to PC1 and the keyboard dongle is plugged into PC1.
2.
Ensure the cabinet is turned on.
3.
Plug the USB into PC1
. Ensure that no other USB’s are plugged in.
4.
Hold down the power button on the front of PC1 until it powers off.
5.
Press the power button on the front of PC1 to turn it on again.
6.
A black box on screen will display the progress of the update. This process can take up to 20
minutes. The percentage at the bottom of the box will show progress to 100%.
7.
Once the process is finished, the last line of text in the black box will instruct you to remove
the USB.
8.
Remove the USB, and the PC will automatically reboot.
9.
If you have performed a system image, you will need to calibrate the headsets. Please refer
to page 29 of this manual for instructions on calibrating the headset.
10.
Once calibration is complete, wait for the Virtual Rabbids software to start up, and you will
be presented with the linking configuration page. On PC1, ensure PC1 is set to YES (setting
can be toggled by clicking it using the trackpad on the keyboard), as shown below, then click
confirm. The software will reboot.
Summary of Contents for VIRTUAL RABBIDS THE BIG RIDE
Page 27: ...27 9 Close bottom door and the top access door...
Page 67: ...67...
Page 68: ...68...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71...
Page 72: ...72...
Page 73: ...73...
Page 74: ...74...
Page 75: ...75...
Page 76: ...76...
Page 77: ...77...
Page 78: ...78...
Page 79: ...79...
Page 80: ...80...
Page 81: ...81...
Page 82: ...82 MECHANICAL ILLUSTRATIONS MAIN ASSEMBLY...
Page 83: ...83 MAIN ASSEMBLY COMPACT VERSION...
Page 84: ...84 MAIN ASSEMBLY MINI VERSION...
Page 85: ...85 MAIN TOWER ASSEMBLY...
Page 86: ...86 MAIN TOWER ASSEMBLY MINI VERSION...
Page 87: ...87 TOWER BASE ASSEMBLY...
Page 88: ...88 DB BOX 240V AND 110V VERSIONS...
Page 89: ...89 FRONT ROTULE ASSEMBLY...
Page 90: ...90 BACK PANEL ASSEMBLY STANDARD AND MINI VERSIONS...
Page 91: ...91 TOWER BASE STATION HATCH AND SLED BASE STATION HOUSING...
Page 92: ...92 BASE STATION ASSEMBLY MINI VERSION...
Page 93: ...93 LEFT AND RIGHT DUST CLOUD ASSEMBLY...
Page 94: ...94 LEFT 1 AND RIGHT 2 HEADER ASSEMBLY...
Page 95: ...95 MOTION BASE ASSEMBLY...
Page 96: ...96 PC CHASSIS ASSEMBLY...
Page 97: ...97 PCB BOARD ASSEMBLY...
Page 98: ...98 POWER SUPPLY ASSEMBLY...
Page 99: ...99 MONITOR ASSEMBLY...
Page 100: ...100 MONITOR ASSEMBLY COMPACT VERSION...
Page 101: ...101 MONITOR ASSEMBLY MINI VERSION...
Page 102: ...102 SEAT ASSEMBLY...
Page 103: ...103 LEFT SKI ASSEMBLY...
Page 104: ...104 RIGHT SKI ASSEMBLY...
Page 105: ...105 SLED ASSEMBLY...
Page 106: ...106 SLED COVER ASSEMBLY...
Page 107: ...107 SLED COIN DOOR ASSEMBLY...
Page 108: ...108 CASH BOX ASSEMBLY...
Page 109: ...109 TOWER BACK DOOR 1 ASSEMBLY...
Page 110: ...110 TOWER BACK DOOR 2 ASSEMBLY...
Page 111: ...111 TOWER UPPER LED...
Page 112: ...112 HTC VIVE HEADSET ASSEMBLY...