Operator's Manual
–
Most Wanted
©
LAI GAMES
2
MACHINE INSTALLATION and INSPECTION
When installing and inspecting
“Most Wanted”
, be very careful of the following points
and pay attention to ensure that the players can enjoy the game safely.
Be sure to turn the power
OFF
before working on the machine.
Make sure the power cord is not exposed on the surface (floor, ground, etc.) where
people walk through.
Check that the rubber glide feet levelers are set evenly on the floor so that the game
cabinet is unable to roll and is stable.
Always make complete connections for the integrated circuit (IC) logic PC Boards
and other connectors. Insufficient insertion can damage the electrical components.
Only qualified personnel should inspect or test the integrated circuit (IC) logic PC
Boards.
If any integrated circuit (IC) logic PC Boards should need servicing. Please contact
the nearest
LAI GAMES
distributor.
(Refer to the back page of this manual)
* CAUTION! *
Before
switching the machine on be sure to check that it has been set on the
correct voltage for your area!
Refer
to the mains voltage adjustment section of this. Machines are normally
shipped on 220V AC unless otherwise specified.
* WARNING! *
Always
Turn
OFF
mains power before removing safety covers and refit all safety
covers when work is completed.
Summary of Contents for Most Wanted
Page 36: ...Operator s Manual Most Wanted LAI GAMES 31 TICKET DISPENSER REFERENCE GUIDE...
Page 37: ...Operator s Manual Most Wanted LAI GAMES 32...
Page 38: ...Operator s Manual Most Wanted LAI GAMES 33...
Page 39: ...Operator s Manual Most Wanted LAI GAMES 34...
Page 40: ...Operator s Manual Most Wanted LAI GAMES 35...
Page 42: ...Operator s Manual Most Wanted LAI GAMES 37 3D EXPLODE PARTS...
Page 43: ...Operator s Manual Most Wanted LAI GAMES 38 MOST WANTED WIRING DIAGRAM...