RIGGING / SAILS
45
3
RIGGING / SAILS
3.3
Running rigging
3.2
Standing rigging
The LAGOON 52 F has been adjusted by the shipyard and by the mast
manufacturer when first masting.
The cables stretch a little during the first sailings. Therefore it is
advisable to have the mast inspected and adjusted by a specialist.
Before you put out to sea, it is essential to make sure that the standing
rigging is in good condition: inspect the gooseneck, turnbuckles, and
check the condition of the shrouds.
To hoist a crew member up to the top of the mast, use the man
hoisting halyard.
Belay the crew member with a bowline on the bosun’s chair ring (do
not use snap shackle or shackle).
LAGOON 52 F
RECOMMENDATION
Any intervention on the standing rigging comes
within a specialist remit.
WARNING
The man hoisting halyard which is the only one to be
authorized for this purpose, is only meant to hoist a
crew member up to the top of the mast.
Description of the ropes
length (m)
diameter (mm)
Mainsail halyard
56 + 14
12 + 10
Mainsail topping lift
57
12
Genoa halyard
(tensioning mast step)
18,5
10
Genoa lowering halyard
30
8
Reef 1
16 + 8
14 + 10
Reef 2
17 + 16
14 + 10
Reef 3
18 + 25
14 + 10
Mainsail sheet
30
14
Self-tacking jib sheet
29
14
Genoa furling line
29
10
Code 0 halyard
50 + 35
14 + 12
Code 0 / spinnaker sheet
40
14
Staysail halyard
50
14
Man hoisting halyard
55
10
Reef cunnigham 1
13
14
Reef cunnigham 2
18
14
Reef cunnigham 3
23
14
Port traveller adjustment
13
10
Starboard traveller adjustment
17
10
Summary of Contents for 52 F
Page 1: ...User s guide...
Page 2: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 26: ......
Page 28: ...DECK EQUIPMENT 26 HULL DECK LAGOON 52 F HULL PROTECTIONS...
Page 40: ......
Page 41: ...RIGGING SAILS 3 1 Sailing 3 2 Standing rigging 3 3 Running rigging 3 4 Sails 39 3...
Page 56: ......
Page 62: ......
Page 72: ......
Page 82: ......
Page 83: ...ELECTRICITY 7 1 12 V circuit 7 2 Inverters 7 3 110 V 220 V circuit 7 4 Electronics 81 7...
Page 92: ...GENERAL BLOCK DIAGRAM 12 V 90 ELECTRICITY LAGOON 52 F...
Page 96: ...STANDARD CIRCUIT EQUIPMENT 94 ELECTRICITY LAGOON 52 F INVERTER...
Page 97: ...CHARGING CIRCUIT 220 V 12 V 95 7 ELECTRICITY LAGOON 52 F...
Page 106: ......
Page 116: ......
Page 117: ...WINTER STORAGE 9 1 Laying up 9 2 Protection 115 9...
Page 120: ......
Page 121: ...HANDLING 10 1 Preparation 10 2 Crane lifting 10 3 Mast stepping Mast unstepping 119 10...
Page 122: ...DIMENSIONS FOR CRADLE POSITIONING 120 HANDLING LAGOON 52 F 2612 5 mm 9312 5 mm...
Page 124: ......
Page 126: ...124 SAFETY LAGOON 52 F...
Page 136: ......
Page 137: ...MAINTENANCE 135 12...
Page 140: ......
Page 142: ......
Page 143: ......
Page 144: ...UPDATED 01 2016...