HULL / DECK
35
2
HULL / DECK
z
INSTALLING A TENDER ONTO THE DAVITS
Fix the davit rope hooks to the front and rear parts of the tender.
Remove the equipment from the tender and remove the water drain
plug.
Activate the controls present on the starboard davit.
A remote control is available as an option.
z
LAUNCHING A TENDER FROM THE DAVITS
Put the water drain plug back into position in the tender.
Make fast the tender and then operate the control.
Install onboard the tender all the safety equipment in pursuance of the
regulations of the country where your boat is registered.
2.8 Gangway (optional extra)
The boat may optionally be fitted with a foldable carbon gangway.
Remove, store and stow the gangway when sailing.
2.9 Davits (optional extra)
The davits operate using two hydraulic cylinders.
They are automatically energized as soon as the domestic general
battery switch is set to ON.
In case of malfunctioning, check the fuse in the box located in the
starboard engine compartment.
LAGOON 52 F
WARNING
Do not use the gangway as a diving board.
WARNING
The davits are designed to support a maximum
load of 300 kg and a tender which is maximum 3,90
metres long.
WARNING
Nobody should be on board or under the tender
during manoeuvres carried out with the davits.
Tie up the tender during manoeuvres.
Summary of Contents for 52 F
Page 1: ...User s guide...
Page 2: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 26: ......
Page 28: ...DECK EQUIPMENT 26 HULL DECK LAGOON 52 F HULL PROTECTIONS...
Page 40: ......
Page 41: ...RIGGING SAILS 3 1 Sailing 3 2 Standing rigging 3 3 Running rigging 3 4 Sails 39 3...
Page 56: ......
Page 62: ......
Page 72: ......
Page 82: ......
Page 83: ...ELECTRICITY 7 1 12 V circuit 7 2 Inverters 7 3 110 V 220 V circuit 7 4 Electronics 81 7...
Page 92: ...GENERAL BLOCK DIAGRAM 12 V 90 ELECTRICITY LAGOON 52 F...
Page 96: ...STANDARD CIRCUIT EQUIPMENT 94 ELECTRICITY LAGOON 52 F INVERTER...
Page 97: ...CHARGING CIRCUIT 220 V 12 V 95 7 ELECTRICITY LAGOON 52 F...
Page 106: ......
Page 116: ......
Page 117: ...WINTER STORAGE 9 1 Laying up 9 2 Protection 115 9...
Page 120: ......
Page 121: ...HANDLING 10 1 Preparation 10 2 Crane lifting 10 3 Mast stepping Mast unstepping 119 10...
Page 122: ...DIMENSIONS FOR CRADLE POSITIONING 120 HANDLING LAGOON 52 F 2612 5 mm 9312 5 mm...
Page 124: ......
Page 126: ...124 SAFETY LAGOON 52 F...
Page 136: ......
Page 137: ...MAINTENANCE 135 12...
Page 140: ......
Page 142: ......
Page 143: ......
Page 144: ...UPDATED 01 2016...