
Mascot II Boilers and Water Heaters
Page 11
*When vent terminal is less than 10 feet (3m) horizontally
from a forced air inlet, the terminal must be at least 3 feet
(0.9m) above the air inlet.
Figure 9. Combustion Air and Vent Through Side Wall.
U.S. Installations (see note 1)
Canadian Installations (see note 2)
A=
Clearance above grade, veranda, porch,
12 inches (30 cm)
12 inches (30 cm)
deck, or balcony
See note 6
See note 6
B=
Clearance to window or door that may be Direct vent only: 12 inches (30cm);
36 inches (91 cm)
opened
Other than Direct vent: 4 ft (1.2m) below or to
side of opening; 1 ft (30cm) above opening
C=
Clearance to permanently closed window
See note 4
See note 5
D=
Vertical clearance to ventilated soffit located
above the terminal within a horizontal
See note 4
See note 5
distance of 2 feet (61cm) from the center
line of the terminal
E=
Clearance to unventilated soffit
See note 4
See note 5
F=
Clearance to outside corner
See note 4
See note 5
G=
Clearance to inside corner
3 feet (91 cm) minimum
See note 5
H=
Clearance to each side of center line
3 feet (91 cm) within a height 15 feet
extended above meter/regulator assembly See note 4
above the meter/regulator assembly
I=
Clearance to service regulator vent outlet
See note 4
3 feet (91 cm)
J=
Clearance to nonmechanical air supply
Direct vent only: 12" (30cm) 80-285; 36" (91cm)
inlet to building or the combustion air inlet 399-850. Other than Direct vent: 4 ft (1.2m) below 36 inches (91 cm)
to any other appliance
or to side of opening; 1 ft (30cm) above opening
K=
Clearance to a mechanical air supply inlet 3 feet (91 cm) above if within 10 feet (3 m)
6 feet (1.83 m)
horizontally
L=
Clearance above paved sidewalk or paved
Vent termination not allowed in this location
Vent termination not allowed in this
driveway located on public property
for category IV appliances.
location for category IV appliances.
M=
Clearance under veranda, porch, deck,
See note 4
12 inches (30 cm) (see note 3)
or balcony
Notes:
1. In accordance with the current ANSI Z223.1 / NFPA 54 National Fuel Gas Code.
2. In accordance with the current CAN/CGA-B149 Installation Codes.
3. Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor.
4. For clearances not specified in ANSI Z223.1 / NFPA 54, clearance is in accordance with local installation codes and the requirements of the
gas supplier.
5. For clearances not specified in CAN/CGA-B149, clearance is in accordance with local installation codes and the requirements of the gas
supplier.
6. IMPORTANT: terminal must be placed such that it remains a minimum 12" above expected snow line. Local codes may have more
specific requirements, and must be consulted.
Summary of Contents for LMH
Page 42: ...LAARS Heating Systems Page 40 Figure 28 Panel Assembly Door Top...
Page 43: ...Mascot II Boilers and Water Heaters Page 41 Figure 29 Panel Assembly Door Middle...
Page 44: ...LAARS Heating Systems Page 42 Figure 30 Panel Assembly Door Bottom...
Page 45: ...Mascot II Boilers and Water Heaters Page 43 Figure 31 Base Jacket Assembly...
Page 46: ...LAARS Heating Systems Page 44 Figure 32 Heat Exchanger Cabinet Fan...
Page 47: ...Mascot II Boilers and Water Heaters Page 45 Figure 33 Heat Exchanger Burner Components...
Page 48: ...LAARS Heating Systems Page 46 Figure 34 Pump Assembly Components...
Page 49: ...Mascot II Boilers and Water Heaters Page 47 Figure 35 Plumbing Components...
Page 50: ...LAARS Heating Systems Page 48...