background image

HANDMADE IN FLORENCE

Also available in 

UL - NSF

 version

HANDMADE IN FLORENCE

GB/5

FB/80

La Marzocco

 s.r.l.

Via Bolognese 

68

 Pian Di San Bartolo 

50010

 Firenze, Italy

t:

 +39.055.401.390 

 f:

 +39.055.401.349

e-mail: [email protected]
www.lamarzocco.com

Operating Manual

available

Ver. 1.3

Summary of Contents for GB/5

Page 1: ...Also available in UL NSF version HANDMADE IN FLORENCE GB 5 FB 80 Operating Manual available Ver 1 3...

Page 2: ...pters 1 General Warnings and Safety Specifications 2 Definition of Available Models 3 Installation 4 Operating the Espresso Machine and Preparing Coffee 5 Preparing Other Hot Drinks 6 Preventative Mai...

Page 3: ...ind which conforms to local national and international electrical codes and safety regulations being careful not to exceed the power and current ratings indicated on such adapters and extension cords...

Page 4: ...Panel 6 Group 1 Keypad 7 Digital Display 8 Steam Wand 9 Steam Knob 10 Hot Water dispense nozzle 11 Removable Drain Tray 12 Manual Brew Switch EE model 13 Hot Water Switch EE model For additional infor...

Page 5: ...st at a pressure of 18 bar and has an operating pressure of 9 bar The following table is a list of effective volumes and power ratings according to the number of groups installed 2 groups 3 4 liters 1...

Page 6: ...V1 3 3 Installation Water Pump and Motor Water Filtration Softener Waste Drain Electrical Supply Connection Water Pump Motor Power Cord Power Supply Cord Drain Hose Connection Water Supply Connection...

Page 7: ...ly with cold water Make sure that water is always present while the pump is operating otherwise air can be introduced into the brew boiler causing an undesireable condition 3 Electrical Connections a...

Page 8: ...ee Boiler Filled should be displayed Press enter to confirm that the preceding procedures are complete The installation is now complete and the espresso machine should be heating to the operating temp...

Page 9: ...d to prepare another cup and only at that time should you place a new dose of ground coffee in the filter The size of the coffee granules is extremely important in preparing a good cup of coffee other...

Page 10: ...l you get the right amount of foam You can then pour this milk into a cup containing warm espresso and you will end up with a fresh cup of cappuccino In order to prevent the heated liquid from being s...

Page 11: ...s listed below very carefully Diffuser Screen Group Assembly Diffuser Screw 6 Cleaning the Diffuser Screen Due to filter holder discharge operations subsequent to coffee brewing a certain amount of co...

Page 12: ...to the water pump Remove the reinforced plastic tubing on the drain connection At this point the machine may be removed from the bar being very careful not to drop it or squash your fingers The machi...

Page 13: ...y to the coffee boiler and are thus an integral part of the boiler itself The boiler assembly is shaped in such a way that each group is located at a greater height than the boiler so that just like i...

Page 14: ...allows continuous brewing operation which can be interrupted by pressing the very same button again CONSTRUCTION DETAILS They consist essentially of 2 small boilers of which 1 Coffee Boiler hot water...

Page 15: ...HANDMADE IN FLORENCE La Marzocco s r l Via Bolognese 68 Pian Di San Bartolo 50010 Firenze Italy t 39 055 401 390 f 39 055 401 349 e mail florence lamarzocco com www lamarzocco com...

Reviews: