Rigging procedures
10.
Remove SB18#3 from SB18#2 as follows:
a) Remove a T-BLP from an SB18#2 bottom link point.
b) Rotate the link arm down.
c) Lock the link arm in closed position by re-inserting the T-BLP into SB18#3.
d) Repeat this procedure until all four arms are locked in closed position.
11.
Raise the array until SB18#2 is removed from SB18#3.
12.
Attach a dolly board to each of the SB18#3 and SB18#4 subwoofers.
13.
Remove SB18#4 from SB18#3 by applying step
(p.88).
14.
Remove SB18#3 and SB18#4 from the rigging location.
15.
Lower the array until it rests on the ground.
16.
Detach the motor hook(s) or stinger(s) from the KARA-MINIBU shackle(s).
88
Kara owner's manual (EN) version 1.0