Rigging procedures
5.
Put the M-BUMP onto SB18#1 by keeping the orientation and attach the four rigging arms of SB18#1 to the M-BUMP
as follows: disconnect a T-BLP from SB18#1, rotate the rigging arm up, re-connect the T-BLP to the M-BUMP rigging
point and the rigging arm ; repeat this procedure until all 4 arms are secured.
6.
Attach the motor hook(s) or stinger(s) to the shackle(s).
7.
Raise the array so that it is possible to place another stack of two SB18 under it.
Kara owner's manual (EN) version 1.0
71