Rigging procedures
2.
(Optional, see
(p.189)) Install one or two M-BAR on the M-BUMP as follows (repeat for
each M-BAR):
a) Remove both T-BLP from the M-BAR.
b) Insert both M-BAR studs face to the desired M-BUMP holes.
c) Secure by inserting both preceding T-BLP through M-BAR studs and M-BUMP holes.
In case of SB18 standalone array rigging, the M-BAR is not useful unless it is intended to modify the distance
between the rigging points (see
(p.189)).
b.
c.
3.
Attach the shackle(s) to the M-BUMP (see
APPENDIX D: Safety pin removal and insertion
(p.199)) according to the
(p.189)).
4.
Build a stack composed of two SB18 (hereafter called SB18#1 and SB18#2) at the rigging location as follows:
a) Place two SB18 at the rigging location and remove the dolly boards.
b) Put SB18#1 onto SB18#2 so that the front grills are facing the audience and the logos are placed at the bottom.
c) Attach the four rigging arms of SB18#2 to SB18#1 as follows: disconnect a T-BLP from SB18#2, rotate the
rigging arm up, re-connect the T-BLP to the SB18#1 rigging point and the rigging arm ; repeat this procedure
until all 4 arms are secured.
70
Kara owner's manual (EN) version 1.0