Rigging procedures
13.
Attach the KARA#1/platform assembly to the top SB18 (SB18#2 for example) as follows:
a) Turn the assembly feet pointing down and KARA#1 front face towards audience.
b) Position the assembly onto SB18#2 sliding it downwards along the SB18#2 rigging elements.
c) Secure the assembly and SB18#2 link points together by removing the four KARA-MINIBUEX T-BLP from their
storage
holes and re-inserting them into their
link
holes.
14.
Open the four KARA#2 arms by applying step
(p.125).
15.
Remove the four KARA#2 bottom R-BLP from their
link
holes and re-insert them into their
storage
holes (see step
(p.127)).
128
Kara owner's manual (EN) version 1.0