Rigging procedures
Mounting K3-CHARIOTLID to K3
Type of deployment
stacked array
K3-CHARIOTLID
Rigging accessory
K3-CHARIOT
Min number of operators
1
Prerequisite
An array of four K3 is stacked on K3-CHARIOT.
Procedure
1.
Prepare the top enclosure for K3-CHARIOTLID.
a) Lift the front rigging arms and secure the ball-locking pin to the LINK position.
b) Lift the rear rigging arms and secure the ball-locking pin to 0.25° position.
96
K3 owner's manual (EN) version 1.0