Inspection and preventive maintenance
Rigging check
Procedure
1.
Position one K3 on top of another one.
2.
Secure the front rigging arms at the LINK holes.
• The front rigging arms can be deployed with some resistance, and rotate correctly.
• The ball-type plunger protrudes out the rigging system.
K3 owner's manual (EN) version 1.0
53