Rigging procedures
Final check
Visually check that no yellow labels are visible.
Manually check that all linking points are secured.
3.
Select the pickup point and raise the array.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
F
R
FRONT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
4.
Add additional enclosures under the array.
a) Lower the array onto a KS21 or a stack of KS21 on KS21-CHARIOT.
Align the runners and the tracks.
b) Connect the enclosures on both sides.
SHLAK!
c) Unlock the KS21-CHARIOT rigging arms.
74
A10 owner's manual (EN) version 1.1