2NL/2P8
1-3-168
U905
Checking counts by optional devices
Description
Displays the counts of document processor or document finisher.
Purpose
To check the use of document processor or document finisher.
Method
1. Press the start key.
2. Select the device to be checked. The count of the selected device is displayed.
DP
DF
Completion
Press the stop key. The screen for selecting a maintenance item No. is displayed.
U906
Resetting partial operation control
Description
Resets the service call code for partial operation control.
Purpose
To be reset after partial operation is performed due to problems in the cassettes or other sec-
tions, and the related parts are serviced.
Method
1. Press the start key.
2. Press [Execute].
3. Press the start key to reset partial operation control.
4. Turn the main power switch off and on. Allow more than 5 seconds between Off and On.
Item No.
Description
Display
Description
DP
Counts of document processor
DF
Counts of document finisher
Display
Description
ADP
Counts of single-sided originals that has passed through the DP
RADP
Counts of double-sided originals that has passed through the DP
CIS
Counts of Double-sided simultaneous reading originals that has
passed through the DP
Display
Description
Sorter
Counts of copies that has passed through the sorter
Staple
Frequency the stapler has been activated
Summary of Contents for TASKalfa 3010i
Page 10: ...This page is intentionally left blank ...
Page 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Page 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Page 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Page 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Page 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 568: ...DP 773 Document processor Installation Guide ...
Page 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 602: ...PF 810 3000 sheet deck Installation Guide ...
Page 615: ...DF 791 3000 sheet finisher Installation Guide ...
Page 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Page 648: ...AK 740 Bridge unit Installation Guide ...
Page 650: ...MT 730 B Mailbox Installation Guide ...
Page 665: ...PH 7A C D Punch unit Installation Guide ...
Page 686: ...DT 730 B Document tray Installation Guide ...
Page 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 732: ...FAX System W B Installation Guide ...