2NL/2P8
1-2-2
Unpack
Install the optional paper feeder
Release the scanner lock
Load paper
Remove the tapes and spacer
Start
Install the toner container
Attaching the language label
(Excluding 240V AC)
Make test copies
Connect the power cord
Exit maintenance mode
Print out the user setting list
Execution of initial-setting operation
Execution of mentenance item U952
Set cassette heater control
(maintenance item U327)
Setting the delivery date
(maintenance item U278)
Completion of the machine installation
Switch the cassette heater switch
Install the other optional devices
Clearing the counter
(maintenance item U927)
Output an own-status report
(maintenance item U000)
1-2-2 Unpacking and installation
(1) Installation procedure
Summary of Contents for TASKalfa 3010i
Page 10: ...This page is intentionally left blank ...
Page 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Page 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Page 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Page 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Page 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 568: ...DP 773 Document processor Installation Guide ...
Page 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 602: ...PF 810 3000 sheet deck Installation Guide ...
Page 615: ...DF 791 3000 sheet finisher Installation Guide ...
Page 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Page 648: ...AK 740 Bridge unit Installation Guide ...
Page 650: ...MT 730 B Mailbox Installation Guide ...
Page 665: ...PH 7A C D Punch unit Installation Guide ...
Page 686: ...DT 730 B Document tray Installation Guide ...
Page 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 732: ...FAX System W B Installation Guide ...