Final operations
71
Trial run
Referring to the operating manual, adjust the machine and carry
out a trial run.
Check the following after the assembly process.
•
Length of PTO shaft. See »PTO shaft length«, page 55.
•
All bolts and torques
•
Correct routing of the hydraulic hoses and electrical cables
•
Hydraulic connections (based on the components)
Extend and retract the hydraulic cylinders from their end position at
least 10 times in order to bleed the cylinders.
Once complete, check the hydraulic system for leaks.
Environment
•
Dispose of packaging according to the current local waste disposal
guidelines.
•
Ensure that lubricants are handled and disposed of correctly.
No persons within the slewing range
In the slewing range, there is an acute risk of injury from swivelling
or folding implement components.