Delivery and assembly
65
Mounting the hopper
Procedure
Turn the hopper so that the hoses come out from the front of the
machine.
Place the hopper on the support.
Align the fixing holes.
Position the 10 screws M12x80 (A) on the sides of the support.
Place the 4 screws M12x30 (B) at the front and rear of the support.
Fix all to the recommended tightening torques.
Mounting the
walkway
Task description
The seed drill is accessed from the rear of the machine via the stairs
and the walkway. Adjustments to the seed drill are carried out either
by the walkway or on the ground by the rear of the machine.
Procedure
Mount the walkway on the hopper support.
Position the 4 screws M16x40 (A) in the holes provided.
Place the nuts M16 on the screws.
Install the 2 guardrails.
Position the 8 brackets (B) in the holes provided.
Fix the brackets using M8 nuts (C).
A
B
A
B
B
C
Summary of Contents for a-drill
Page 80: ...Seed drill adjustment 80 Sowing tables ...
Page 81: ...Seed drill adjustment 81 ...
Page 82: ...Seed drill adjustment 82 ...
Page 83: ...Seed drill adjustment 83 ...
Page 84: ...Seed drill adjustment 84 ...
Page 85: ...Seed drill adjustment 85 ...
Page 89: ...Filling the seedbox 89 Qualidisc and Qualidisc Farmer Unfold the machine Fill in the seedbox ...
Page 95: ...Adjustments 95 Main display Organisation of the menus ...