
Initial Powering Operations for the ON-HD Lift
KVAL ON-HD Operation Manual
2-3
Initial Powering Operations for the ON-HD Lift
This section describes how to power up and to power down the
ON-HD Lift
.
Powering up the system includes:
• Applying power to the entire system
• Starting the Control Circuit
Powering down the system includes:
• Shutting down the control power
• Removing power from the entire system
How to Power Up the ON-HD Lift
1.
Ensure factory air is applied to each machine and main air supply is turned on.
2.
Check that all E-Stop buttons are out and safety gates are closed.
Note:
A pop-up is displayed on the user screen if an E-Stop is pressed. The pop-up
will indicate which E-Stop has been activated
.
Don t Forget
Air ON
Closed Gates and E-Stops
Turn ON E-Box Disconnect
3.
Make sure the electrical disconnect each electrical
cabinet is turned to the ON position.
4.
Switch the green
Computer
switch to the ON positions. It
will light up.
5.
Push the green
Start Machine
buttons to “boot up” the
machines.
Note:
Boot up may take 2 to 3 minutes.
6.
All lights on the light tower located on the top of the Electrical Box box
should be green.
See “Description of the Light Tower” on page 2-21
Note:
If a status light does not turn on during the power up process, see
the
trouble shooting chapter in the Service Manual.
Summary of Contents for ON-HD
Page 4: ...KVAL ON HD Operation Manual ...
Page 8: ...KVAL ON HD Lift Manual Table of Contents ...
Page 13: ...Safety First KVAL ON HD Operation Manual 1 5 ...
Page 30: ...Safety Sign Off Sheet KVAL ON HD Operation Manual 1 22 ...
Page 54: ...About the Safety Curtain KVAL ON HD Operation Manual 2 24 ...
Page 70: ...Index Kval ON HD ...
Page 71: ......