Initial Powering Operations for the Edge-SS
KVAL Operation Manual
3-6
Initial Powering Operations for the Edge-SS
This section describes how to power up and to power down the Edge-SS.
Powering up the system includes:
• Applying power to the entire system
• Starting the Control Circuit
Powering down the system includes:
• Shutting down the control power
• Removing power from the entire system
How to Power Up the Vision Line
1.
Ensure factory air is applied to each machine and main air supply is turned on.
2.
Check that all E-Stop buttons are out and safety gates are closed.
Note:
A pop-up is displayed on the user screen if an E-Stop is pressed. The pop-up
will indicate which E-Stop has been activated
3.
Make sure the electrical disconnect each electrical
cabinet is turned to the ON position.
4.
Switch the green
CONTROL CIRCUIT
switches to the ON posi-
tions. They should light up.
5.
Push the green
START MACHINE
buttons to “boot up” the
machines.
Note:
Boot up may take 2 to 3 minutes.
6.
When the machine is ready to operate, all status lights on the
signal tower should be green.
Summary of Contents for Edge-SS
Page 4: ...KVAL Edge SS System Operation Manual ...
Page 6: ...KVAL Edge SS System Operation Manual ...
Page 12: ...KVAL Edge SS Manual Table of Contents ...
Page 49: ...About Revisions 2 16 KVAL Manual ...
Page 84: ...Common Terms 2 51 KVAL Manual FIGURE 2 11 Example of a Validation Report ...
Page 147: ...About the Nodes 5 21 KVAL Operation Manual ...
Page 149: ...Index Kval Edge SS clean up 12 inspect 12 ...
Page 150: ......
Page 151: ......