Powering up the system includes:
• Applying power to the entire system
• Starting the Control Circuit
Powering down the system includes:
• Shutting down the control power
• Removing power from the entire system
How to Power Up the 979-2
1.
Ensure factory air is applied to machine and main air supply is turned on.
2.
Check to make sure all E-Stop buttons are out.
Note:
A pop-up is displayed on the user screen if an E-Stop is pressed. The pop-up will
indicate which E-Stop has been activated
3.
Make sure the electrical disconnect the electrical cabinet is turned to the ON posi-
tion.
.
4.
Switch the green
CONTROL TRANS-
FORMER
switch to the ON position.
It should light up.
5.
Push the green
START MACHINE
button to “boot up” the machine.
Control Transformer
Start
6.
All lights on the status light panel on the electrical
box should be illuminated. See “Description of the
Six Light Panel ” on page 2-10
Note:
If a status light does not turn on during the power
up process, see “Troubleshooting with the Status
Light Panel” on page 5-10 for assistance in identi-
fying the issue.
Summary of Contents for 979-2
Page 4: ...KVAL 979 2 Operation Service Manual ...
Page 8: ...979 2 Miter Trim Saw System ...
Page 23: ...Getting Help from KVAL 1 15 KVAL 979 2 Operation Service Manual Page Intentionally Left Blank ...
Page 25: ...Safety Sign Off Sheet 1 17 KVAL 979 2 Operation Service Manual ...
Page 60: ...Notes ...
Page 64: ...System IT Administration 3 4 KVAL 979 2 Operation Service Manual ...
Page 86: ...Mechanical Adjustments 4 22 KVAL 979 2 Operation Service Manual ...
Page 105: ...Notes ...
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......