Initial Powering Operations for the 960-3 Line
2-5
KVAL Operation/Service Manual
Initial Powering Operations for the 960-3 Line
This section describes how to power up and to power down the 960-3.
How to Power Up the Machine
How to Power Down the Machine
Ensure factory air is applied to each machine
and main air supply is turned on.
1.
Turn the disconnect switch on the
electrical cabinet to
ON.
2.
Initiate the green
CONTROL
TRANSFORMER
to the
ON
posi
-
tion.
3.
Push the
START
button to start
the machine.
Note:
All lights on the status light
panels on the electrical box
should be illuminated.
1.
Push the
STOP
button.
2.
Switch the green
CONTROL
TRANSFORMER
the OFF posi
-
tion.
3.
Turn the disconnect switch on
the electrical cabinets to
OFF
.
Summary of Contents for 960-3
Page 4: ...KVAL 960 3 Operation Service Manual ...
Page 28: ...Safety Sign Off Sheet 1 21 KVAL Operation Service Manual ...
Page 46: ...Description of the Light Tower KVAL Operation Service Manual 2 18 ...
Page 64: ...Appendix Collet Torque Values KVAL Operation Service Manual 3 18 ...
Page 65: ...Appendix Collet Torque Values 3 19 KVAL Operation Service Manual ...
Page 67: ...Notes ...