Krypton Neon DIS Installation and Set Up Guide
Kuntze Instruments
3316 Leechburg Road | Lower Burrell | Pennsylvania | 15068
724-339-8510 | [email protected] | kuntzeinsturments.com
General Steps
1. Mount the system upright on the wall
2.
Insert clean sensor
Insert Disinfection sensor into the Flow Cell Chamber for the
Disinfection Sensor (5) and screw on the Disinfection Cable
3. Power on system
4.
Check flow
5.
Calibrate sensor
6. If needed, set user specific settings
– see operations manual
a. ASR
b. 4
– 20 mA
c. Relay Alarms
Key
1
– Neon DIS Instrument
2
– Argon Stabiflow
3
– FTG Temperature Cable
4
- Disinfection Cable
5
– Flow Cell Chamber for Disinfection Sensor
6
– Water Inflow Valve
7
– Water Outflow Valve
8
– Water Sampling Reference Valve
9
– Mounting Board
Check Your Flow
Make sure the Water Sampling Reference Valve is in the closed position.
System needs proper
flow to operate. “Digital input 1 – no water” will show on display screen if
flow is not strong enough.
Flow minimum: 5 psi
Flow maximum: 87 psi
Power Requirements
System comes with US power cord
Line Voltage
:
85-265 V AC, 50-60 Hz
Power Consumption
:
10 VA
Cleaning Sensor
IMPORTANT
: Sensor must be cleaned by
hand before being inserted into the chamber!
How to clean DIS sensor:
- Remove sensor from assembly and cable
- Wipe off any pollution with paper tissue, rinse
with water
- Clean metal bands with powder detergent (ex.
Comet), wipe gently
- Rinse with water and reinstall
Calibrating Sensor
DIS Sensor
1.
IMPORTANT: Clean sensor before
proceeding with calibration!
2. Using water sample taken from Sampling
Reference Valve, perform DPD test
3. Menu > Cal > Cal DIS > enter DPD
reference value > Ok > Save