MERGE MAXX 950
52
6. - Putting into service
KN233BGB_C
Merger
6.4.8 Electrical connections
Terminal
- Connect the 7-pin plug (1) of the module (3) to the
terminal (2).
- Connect wiring harness (4) of module (3) to tractor
3-pin socket (5).
- Connect 7-pin plug to the tractor.
- After connecting the harness, check that
there is no risk of them getting caught in
operation.
6.4.9 Primary PTO shaft
Before using the machine for the first time:
- Grease the transmission.
- Check overlap of the u-joint drive shaft and
adjust length if necessary to avoid any
premature wear.
2
4
3
5
1