Instructions for work
Silo unloader - Straw Spreader
ALTOR 4560
61
7. Distribution
Select the blower speed for feeding: 270 min
-1
.
The distribution chute on the right of the machine is used
for 2 purposes.
- For optimal quality of work and product positioning in
the designed place, the distribution chute cap can be
set to three positions.
- For easy manual adjustment of the position, open the
chute halfway.
- Pull the handle down.
- Put the spindle into the desired notch (the most
external one sets the cap to the greatest angle of tilt).
Operating tips:
- To stop the distribution (posts, obstacles) disengage
the beater bar. (The conveyor stops at the same time).
- To avoid clogging the machine in difficult conditions,
watch the engine speed carefully. Slow down
conveyor speed or even reverse the direction if the
engine speed drops or the belt starts to slip. If it
becomes overloaded, allow it to empty before making
the conveyor move forward again.
Always start the tractor PTO before engaging the
beater bar. Stop the beater bar before stopping
the PTO. If you do not do this in the right order,
you are very likely to block up the blower.
Summary of Contents for ALTOR 4560
Page 2: ......
Page 19: ...Safety Silo unloader Straw Spreader ALTOR 4560 17...
Page 26: ...Silo unloader Straw Spreader 24 ALTOR 4560 Machine specifications 2 Technical specifications...
Page 97: ......
Page 98: ......