//
ORIGINAL OPERATING INSTRUCTIONS
Commissioning
March 3, 2018
20/55
7.1.2
Cable harness fixed installation
Pos.
No.
Function
10
Drive signal / power supply from carrier vehicle to operating unit (Pos. 40)
20
Connecting cable to spreader (valves -> yellow marking)
30
Connecting cable to spreader (sensors -> blue marking)
40
Control system MCSS-5
50
Connection box