Drill - 136
RT120Q Operator’s Manual
Operate
Remove Rod
If the length of rod outside the bore reaches 30’ (9 m), ask a helper to remove rod sections as needed.
Remove Rod Section
1.
Stop rotation of drilling attachment.
2.
Shut down tractor. See page 87 for proper shutdown procedures.
3.
Disconnect and remove appropriate rod section with special tool (p/n 351-272). See “Disassemble Drill
String” on page 138.
Rotating shaft will cause death or serious injury. Stay
away.
To help avoid injury:
•
Only access drill string with hands when tractor is shut down.
•
Always remove second rod (as shown). Leave first rod section attached to drilling attachment.
t48om060w.eps
Summary of Contents for RT120Q
Page 1: ...RT120Q Operator s Manual Issue 2 0 Original Instruction 053 2634 ...
Page 7: ...Overview 6 RT120Q Operator s Manual About This Manual ...
Page 75: ...Operation Overview 74 RT120Q Operator s Manual Leaving Jobsite ...
Page 83: ...Prepare 82 RT120Q Operator s Manual Check Supplies and Prepare Equipment ...
Page 89: ...Drive 88 RT120Q Operator s Manual Shut Down ...
Page 101: ...Transport 100 RT120Q Operator s Manual Retrieve ...
Page 115: ...Plow 114 RT120Q Operator s Manual Finish Job ...
Page 127: ...Backhoe 126 RT120Q Operator s Manual Finish Job ...
Page 140: ...RT120Q Operator s Manual Saw 139 Saw Chapter Contents Set Up 140 Operate 141 Finish Job 143 ...
Page 145: ...Saw 144 RT120Q Operator s Manual Finish Job ...
Page 193: ...Service 192 RT120Q Operator s Manual As Needed ...
Page 213: ...Specifications 212 RT120Q Operator s Manual Declaration of Conformity Information ...
Page 216: ......
Page 217: ......
Page 218: ...RT120Q Operator s Manual Service Record 217 Service Record Service Performed Date Hours ...
Page 219: ...Service Record 218 RT120Q Operator s Manual Service Performed Date Hours ...