Operation
64
Greasing the swing bracket
!
Lubricate both greasing points (see figure to the right) – see the
"Recommended lubricants" section (page 146) – by injecting
grease until fresh grease emerges.
Other greasing points
!
Start engine (page 68).
!
Position the boom, arm, and dozer as shown in the figure. Stop the engine, remove the key. Refer to the "Op-
erating the controls during excavation work" section (page 78)
!
Lubricate all greasing points with grease – see the "Recommended lubricants" section (page 146) – until fresh
grease emerges.
Checking the electric cables and connections
!
Check all accessible electric cables, connectors and connections for condition and security.
!
Repair or replace damaged parts.
!
Check the fuse box and fuse holders for oxidation and dirt, clean if necessary.
Wipe emerged grease off immediately and store dirty
cleaning cloths in the containers provided for disposal.
Wipe emerged grease off immediately and store dirty cleaning cloths in the containers provided for
disposal.