5 Commissioning and Operation
Kübler Group
40 - EN
BA Ants LEB02 - R60074.0009 - 02
5 Commissioning and Operation
5.1 Measures Before Commissioning
The following measures must have been performed prior to commissioning:
Measure
Description
Operate the hardware
according to specification
The operating conditions are defined in the operation manual and
in the manual and must be complied with.
Check the proper
installation of the
measuring system
The V2A coded band must be mounted fix in the top and the bot-
tom of the elevator shaft; it must be sufficiently secured against
slipping.
The tension force must be 100 … 150 N [22.48 … 33.72 lbs].
The lateral distance from the coded band to moving parts must be
at any point at least 50 mm [0.16 ft].
Sensor oscillation in the transversal direction shell not exceed
10 mm [0.03 ft].
Clean the coded band
during commissioning
The coded band must be checked for dirt and foreign bodies and
cleaned during commissioning.
Check the measuring
system prior to
commissioning
In every new installation, the sensor must run once along the
whole installed coded band in order to check the complete sys-
tem for errors or wrong installation.
5.2 Status LED
A one-color LED signals the status of the measuring system:
Display
LED
Meaning
LED off
No voltage
LED on
Supply voltage is applied to the device
5.3 Parameterizing
The measuring system can only be parameterized when the elevator plant system is entirely
connected.
NOTICE
Other applicable manuals
Comply with the further relevant documentation such as data sheet,
operation manual and sensor manual, as well as with the corres-
ponding documents of the evaluation unit or of the elevator control.
Summary of Contents for Ants LEB02
Page 2: ...Inhaltsverzeichnis Deutsch 3 English 24 Français 45 Step by Step Installation 67 ...
Page 67: ...Kübler Group Step by Step Installation BA Ants LEB02 R60074 0009 02 67 a b ...
Page 68: ...Step by Step Installation Kübler Group 68 BA Ants LEB02 R60074 0009 02 c d ...
Page 69: ...Kübler Group Step by Step Installation BA Ants LEB02 R60074 0009 02 69 e f ...
Page 70: ...Step by Step Installation Kübler Group 70 BA Ants LEB02 R60074 0009 02 g h ...
Page 71: ...Kübler Group Step by Step Installation BA Ants LEB02 R60074 0009 02 71 i j ...