12
SERVICE WORK ON THE CHASSIS
42
12.10
Installing the lower triple clamp
0
0
B01058-10
Main work
–
Clean the bearing and sealing elements, check for damage, and grease.
High viscosity grease (
–
Insert the lower triple clamp with the steering stem. Mount the upper steering head
bearing.
–
Check whether the upper steering head seal
is correctly positioned.
–
Slide on protective ring
and O-ring
.
B01739-10
–
Position the upper triple clamp with the handlebar.
–
Mount screw
but do not tighten yet.
–
Position the clutch line and wiring harness.
M01051-10
–
Position the fork legs.
Info
The upper milled groove in the fork leg must be flush with the upper edge of
the upper triple clamp.
Position bleeder screws
toward the front.
M01052-10
–
Fully tighten screws
.
Guideline
Screw, bottom triple clamp
M8
18 Nm
(13.3 lbf ft)
M01053-10
–
Tighten screw
.
Guideline
Screw, top steering head
M20x1.5
12 Nm (8.9 lbf ft)