12 SERVICE WORK ON THE CHASSIS
66
E00377-10
(All Six Days models)
–
Loosen screws
3
. Take out the left fork leg.
–
Loosen screws
4
. Take out the right fork leg.
12.8
Installing the fork legs
H01595-10
Main work
–
Position the fork legs.
Bleeder screws
1
are positioned toward the front.
Info
The rebound damping is located in right fork leg
REB
(red adjusting screw). The compression damping is
located in left fork leg
COM
(white adjusting screw).
Grooves are milled into the side of the upper end of the
fork legs. The second milled groove (from the top) must
be flush with the top edge of the upper triple clamp.
V00334-11
(All standard EXC/XC-W models)
–
Tighten screws
2
.
Guideline
Screw, top triple
clamp
M8
20 Nm
(14.8 lbf ft)
–
Tighten screws
3
.
Guideline
Screw, bottom triple
clamp
M8
15 Nm
(11.1 lbf ft)
V00355-11
(All Six Days models)
–
Tighten screws
2
.
Guideline
Screw, top triple
clamp
M8
17 Nm
(12.5 lbf ft)
–
Tighten screws
3
.
Guideline
Screw, bottom triple
clamp
M8
15 Nm
(11.1 lbf ft)