
3 WORK
22
E01230-01
Main work
–
Check the throttle cable routing.
Both throttle cables must be routed, side by side, on the
back of the handlebars, above the fuel tank bracket on the
right of the frame to the throttle valve body. Both throttle
cables must be secured behind the rubber strap of the fuel
tank support.
» If the throttle cable is not routed as specified:
–
Correct the throttle cable routing.
Finishing work
–
Install the fuel tank. (
–
Mount the seat. (
3.8
Installing the shock absorber
S03615-11
Main work
–
Push splash protector
1
to the side and position the shock
absorber. Mount and tighten screw
2
.
Guideline
Screw, top
shock absorber
M12
80 Nm (59 lbf ft)
Loctite
®
2701™
–
Mount and tighten screw
3
.
Guideline
Screw, bottom
shock absorber
M12
80 Nm (59 lbf ft)
Loctite
®
2701™
Info
The heim joint for the shock absorber on the link fork
is Teflon coated. It must not be lubricated with grease,
nor with any other lubricants. Lubricants dissolve the
Teflon coating, thereby drastically reducing the service
life.
Finishing work
–
Remove the motorcycle from the lift stand. (