
MAINTENANCE WORK ON CHASSIS AND ENGINE
49
100023-11
(EXC
‑
F EU, EXC
‑
F AUS, XCF
‑
W ZA)
–
Loosen screw
. Remove the fork leg on the left.
–
Loosen screw
. Remove the fork leg on the right.
13.29
Installing the fork legs
x
100021-10
–
Position the fork legs.
Info
The topmost sunk nut in the fork leg must be flush to the upper edge of the
upper triple clamp.
Position the bleeder screw
to the front.
500094-11
(EXC
‑
F SIX DAYS, XCF
‑
W USA, XC
‑
F, SX
‑
F)
–
Fully tighten screw
.
Guideline
Screw, top triple clamp
M8
17 Nm
(12.5 lbf ft)
–
Fully tighten screw
.
Guideline
Screw, bottom triple clamp
M8
12 Nm
(8.9 lbf ft)
100023-10
(EXC
‑
F EU, EXC
‑
F AUS, XCF
‑
W ZA)
–
Fully tighten screw
.
Guideline
Screw, top triple clamp
M8
20 Nm
(14.8 lbf ft)
–
Fully tighten screw
.
Guideline
Screw, bottom triple clamp
M8
15 Nm
(11.1 lbf ft)
500093-11
–
Position brake caliper, mount and tighten screws
.
Guideline
Screw, front brake caliper
M8
25 Nm
(18.4 lbf ft)
Loctite
®
243™
(EXC
‑
F, EXC
‑
F SIX DAYS, XCF-W)
–
Mount cable clip
.
–
Position the wiring harness.
–
Position the brake line. Put the clamp on, mount and tighten screws
.
–
Install the front wheel.
Summary of Contents for 2009 250 EXC-F SIX DAYS
Page 2: ......
Page 110: ...WIRING DIAGRAM 108 ye re Yellow red ...
Page 111: ...WIRING DIAGRAM 109 ...