moviBOOST VPt / CL
Sr. no.
Description
Page no.
1
General
1
2
Safety
1
2.1
Symbols used in these operating instructions
1
2.2
Personnel qualification and training
1
2.3
Non-compliance with safety instructions
1
2.4
Safety awareness
1
2.5
Safety instructions for the operator / user
1
2.6
Safety instructions for maintenance,
inspection and installation work
1
2.7
Unauthorised modification and manufacture
of spare parts
2
2.8
Unauthorised modes of operation
2
3
Transport and interim storage
2
4
Description
2
4.1
General description
2
4.2
Configuration and function
2
4.2.1
Configuration
2
4.2.2
Function
2
4.3
Dry running protection (supplementary
equipment)
3
4.4
Manual mode
3
4.5
Control cabinet
3
4.6
Flow diagram
4
5
Installation at site
5
5.1
Readiness for operation
5
5.2
Installation and location
5
5.3
Piping
5
5.4
Foundation
5
5.5
Location
5
5.6
Installing a pressure reducer
5
5.7
Location and installation of unpressurised
inlet tanks
5
5.7.1
Location
5
5.7.2
Installation
5
5.8
Valves and fittings
5
5.9
Noise characteristics
5
6
Connection to power supply
6
6.1
Electric wiring
6
6.2
Power supply cable
6
6.2.1
Sizing the power supply cable
6
6.3
Protective measures
6
6.4
Temperature requirements
6
6.5
Humidity requirements
6
6.6
Installation altitude
6
6.7
Pollution exposure
6
6.8
Checking the voltage
6
6.9
Logic / circuit diagrams
6
6.10
Over load relay
6
6.11
Potential equalization
6
Contents
Sr. no.
Description
Page no.
7
Commissioning / start-up
6
7.1
Preparations for commissioning / start-up
6
7.2
Test run
6
7.3
Checking the direction of rotation
7
7.4
Functional description / Automatic mode
7
7.5
Starting the unit
7
7.5.1
Function of the control panel
7
7.5.1.1
Function / Navigation keys
8
7.5.1.2
Display
8
7.5.1.3
Parameter Screen
8
7.5.2
Menu structure
8
7.5.3
Access Level
8
7.6
Displaying and changing parameters
9
7.7
Monitoring
9
7.8
Parameter list
10
7.9
Warning and alerts - overview
14
7.10
Adjusting the settings
14
7.10.1
Setting the set pressure
14
7.10.2
Further settings
14
7.10.2.1
Parameter 3-2-2-37 Bandwidth
14
7.10.2.2
Parameter 3-2-2-17 No-flow detection time
14
7.10.2.3
Parameter 3-2-2-33 / 3-2-2-34
14
7.10.2.4
Parameter 3-2-2-40 save fact to user
14
7.11
Remote-OFF connection (optional)
14
7.12
Shutdown
14
8
Dismantling / reassembling the pumps
15
9
Returning to service
15
10
Maintenance
15
10.1
Operation monitoring
15
11
Work on the control cabinet
15
12
Inspection
15
13
Check list
15
14
Pre-charge pressure
16
15
Electrical performance data
16
16
Shutoff head
18
17
Trouble-shooting
19
Acceptance report
20
Check list for commissioning / start-up
21
Annexure I - Environment Protection -
Product Disposal after useful life
22
Summary of Contents for moviBOOST CL