6.4 Returning to service
WARNING
Failure to re-install or re-activate protective devices
Risk of injury from moving parts or escaping fluid!
▷
As soon as the work is completed, properly re-install and re-activate any safety-
relevant devices and protective devices.
For returning the equipment to service, observe the sections on commissioning/start-
up (
Section 6.1, Page 25) and the operating limits (
In addition, carry out all servicing/maintenance operations before returning the
pump (set) to service. (