5 Installation at Site
24 of 36
BOA-Control PIC
7138.8/01-EN
7. Insert the trim into the valve body again.
8. Screw on the body bonnet in clockwise direction and tighten it to 15 Nm.
5.7 Insulation
If the valve is used for handling hot fluids, insulate it in accordance with the German
energy-saving regulations.
WARNING
Cold/hot piping and/or valve
Risk of thermal injury!
▷
Insulate the valve.
▷
Fit warning signs.
CAUTION
Condensation forming in air-conditioning systems, cooling systems and
refrigerating systems
Ice forming!
Actuating element blockage!
Damage due to corrosion!
▷
Insulate the valve to prevent diffusion.
5.8 Measuring computer
CAUTION
Incorrect operation of the measuring computer
Incorrect readings and setting of valve!
▷
Observe the relevant operating manual of the measuring computer.
The flow rate can be measured at the two pressure measurement connection
branches of the valve in conjunction with a differential pressure gauge. For
measuring the volume flow rate, a measuring kit can be hired on request.
Summary of Contents for BOA-Control PIC
Page 1: ...Pressure independent Control Valve BOA Control PIC Operating Manual ...
Page 34: ......
Page 35: ......