5 Installation at Site
5.1 Safety regulations
DANGER
Persons in the intake area during pump operation
Electric shock! Risk of personal injury!
▷
Never start up the pump set when there are persons in the intake area.
5.2 Checks to be carried out prior to installation
5.2.1
Checking the structural requirements
All structural work required must have been prepared in accordance with the
dimensions stated in the outline drawing/general arrangement drawing.
5.2.2
Checking the operating data
Before inserting the pump set into the discharge tube, verify the data on the name
plate against the data given in the purchase order and the system data.
KSB’s scope of supply includes a separate name plate attached to the end of the
pump cable which indicates the pump and motor data.
1.
Attach this name plate in a clearly visible position outside the discharge tube,
e.g. at the control cabinet, pipeline or mounting bracket.
5.2.3
Checking the lubricant level
The lubricant reservoir is filled at the factory with an environmentally-friendly, non-
toxic lubricant.
Back-up name plate
5 Installation at Site
Amacan P
19 of 68